What Is an HVAC Duct Design?
An HVAC duct design is a set of engineered mechanical drawings that show exactly how heated or cooled air will move through your home. It identifies where supply registers and return air grilles will be placed, how the ductwork will be routed through floors and walls, and what size each duct needs to be to deliver the right amount of air to each room. In Ontario, these drawings are required documentation for a building permit application on new construction and major renovations. Without them, your permit application is incomplete.
What the Drawings Include
Our duct design package starts with a full heat loss and heat gain calculation for your home, performed to HRAI standards. We use those numbers to determine the correct equipment size and then calculate the cubic feet per minute (CFM) of airflow each room requires to maintain comfort. From there, we produce a room-by-room duct layout showing supply outlet locations, return air placement, trunk and branch duct sizing, and equipment connections. Every drawing is completed by a BCIN-certified designer and formatted to meet Ontario Building Code documentation requirements.
Why Accurate Sizing Matters
An oversized furnace cycles on and off too frequently, wears out faster, and leaves rooms with uneven temperatures. An undersized unit runs constantly and never reaches setpoint on the coldest days. Ducts that are too small create high velocity and noise; ducts that are too large lose pressure and leave far rooms starved for airflow. Proper sizing is not just about efficiency — it directly determines whether your home will be comfortable year-round. This is why a design based on your home's actual envelope, insulation values, window area, and floor plan matters far more than a rule-of-thumb estimate.
Who Needs a Duct Design
Anyone applying for a building permit in Ontario for new residential construction or a major addition that includes forced-air heating or cooling will need HVAC mechanical drawings. Custom home builders working across Northern Ontario — Sudbury, North Bay, Espanola, Manitoulin Island, Elliot Lake, Sturgeon Falls, and surrounding areas — rely on these drawings at the permit stage. Homeowners managing their own builds, and renovation contractors adding or modifying ductwork in an existing home, also need proper permit documentation. If your project touches the HVAC system and requires a permit, a BCIN-certified design is required.
How the Process Works
You send us your floor plans — either digital files or clear photos of paper drawings. We review them and confirm what information we need to get started, which typically includes the building location, construction type, insulation values, and window specifications. We then complete the heat loss and gain calculations, size the equipment and ductwork, and produce the permit-ready drawings. Most projects are turned around within five business days of receiving complete plans. We will contact you if anything is missing or unclear before we begin, so the process does not stall partway through.
What to Expect from Your Drawings
You will receive a complete set of BCIN-stamped mechanical drawings formatted for submission to your local building department. The drawings show duct layout, equipment location, register placements, and all supporting sizing documentation. If a building official has a question about the design, we are available to respond. We want your permit to clear without delays, and we stand behind the accuracy of our work. If your project scope changes after we deliver the drawings — for example, a room is added or a window size changes — contact us and we will advise on whether the design needs to be updated.
